Core Access Service
Suspended scaffold rigs engineered across multiple anchor points for wide facades, irregular building footprints, and long continuous elevation runs. Built to cover more of the building in a single setup — engineered, permitted, and ready to move with your GC's schedule.
Not every building fits a standard two-point suspended scaffold rig. Wide frontages, L-shaped and U-shaped footprints, and stepped setback towers need more suspension points to cover the elevation safely and efficiently.
Skybridge Access designs, permits, and installs multipoint suspended scaffold systems for NYC new construction, curtain wall installation, and facade restoration work. By adding anchor points beyond the standard two-point configuration, we engineer platforms that span wider distances and irregular geometries in a single continuous run — instead of breaking the elevation into multiple separate rig moves. Every multipoint system is engineered for the specific building it's supporting, with stamped load calculations for each additional suspension point.
Additional suspension points let a single platform span wide building frontages that would require multiple two-point rig moves — reducing setup time on long facade or curtain wall runs.
L-shaped, U-shaped, and stepped-setback towers get anchor points placed to match the building's actual geometry, not a generic rectangular assumption.
Distributed suspension points carry higher loads over longer spans safely — critical for crews and material staged on the platform during active construction.
Wider continuous platforms mean more crew can work the same elevation simultaneously, sequenced directly with your GC's schedule.
Multipoint rigs require a more involved engineering package than standard two-point suspended scaffold — every additional anchor point and load path needs stamped calculations. We handle the full DOB permit filing and engineering sign-off so your crew can start work as soon as the rig is up.
Every job fully permitted, no surprises mid-project.
Stamped load calculations for every anchor point, not generic setups.
Emergency deployments and accelerated timelines when you need us now.
10+ years suspended access experience per team member.
Manhattan, Brooklyn, Queens, Bronx, Staten Island, Jersey City and beyond.
A multipoint scaffold suspends the platform from more than two roof anchors, distributing load across additional points. It's the right call for wide facades, irregular building footprints (L-shaped, U-shaped, stepped setbacks), or spans where a standard two-point rig can't safely cover the distance in a single pass.
Often yes — that's the main advantage. By adding suspension points, we can engineer a single continuous platform run across a wide or irregular elevation instead of breaking the work into multiple two-point rig moves, which saves time on long facade or curtain wall runs.
It typically requires more engineering and rigging hardware upfront, but for wide or complex elevations it often costs less overall than running multiple two-point rigs sequentially, since crews aren't re-rigging and moving as often.
The permitting process is the same DOB suspended-scaffold filing pathway, but the engineering package is more involved — additional anchor points and load paths all need stamped calculations. We manage the full filing and engineering process.
Wide-frontage residential and commercial towers, buildings with irregular or stepped facades, and large-scale new construction curtain wall jobs where a single continuous platform run across the elevation saves real time on the schedule.
Tell us your building's footprint, frontage, and construction timeline — we'll engineer the right multipoint configuration and get the permit process moving.
Get a Quote Upload Plans for a Proposal →